LoneStar Plastics Manufacturing Facility
LoneStar Plastics required an evaluation of an existing property for the conversion to a plastic bag manufacturing facility on a short, six-month timeline. The existing building consisted of an 88,000-SF manufacturing area and a 7,000-SF administrative office area. This multifaceted project involved numerous tasks, including evaluation of the floor systems to determine if floors could handle the proposed loading; design of equipment foundations for printing equipment, repair and resurfacing the entire industrial floor; relighting of the existing manufacturing area; removing all rooftop ventilation and exhaust equipment; adding AC in the manufacturing area; replacing damaged standing seam roofing; addition of an emergency generator; reconstruction of the trucking apron and trash compactor area; installing an abuse wall and remodeling the administrative office and employee areas.
Client
McLane Company, Inc.
At a glance
95,000 SF
Features
Conversion of existing facility to plastic bag manufacturing facility on a six month timeline
Services
Architectural & Engineering